10mm DC 5V 2phase 4wire Linear Screw Stepper electronic starter Long Lead Linear Screw Shaft Rod

$42.95
FREE Shipping

10mm DC 5V 2phase 4wire Linear Screw Stepper electronic starter Long Lead Linear Screw Shaft Rod

  • Brand: Unbranded

10mm DC 5V 2phase 4wire Linear Screw Stepper electronic starter Long Lead Linear Screw Shaft Rod

  • Brand: Unbranded
RRP: $64.00
Price: $42.95
You save: $21.05 (32%)
Sold by:
$42.95
FREE Shipping

In stock

We accept the following payment methods

Description

1. This product is a 10mm DC 5V 2phase 4wire linear screw stepper electronic starter, ing precise control for linear motion applications. 2. It features a long lead linear screw shaft rod, ensuring smooth and accurate linear movement during operation. 3. The 2phase 4wire design provides stable power transmission and efficient performance, making it suitable for various automation tasks. 4. With a DC 5V power supply, it is easy to integrate into existing electrical systems. 5. The linear screw stepper is ideal for applications that require controlled linear motion, such as in robotics, CNC machines, and 3D printers, delivering reliable and consistent performance.
  • Fruugo ID: 368140907-797079733
  • EAN: 929285261381

Delivery & Returns

Dispatched within 24 hours

  • STANDARD: FREE - Delivery between Wed. 15 October 2025–Fri. 31 October 2025 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Shenzhen Tuku Supply Chain Co., Ltd.
  • Shenzhen Tuku Supply Chain Co., Ltd.
  • 202-5, Jinhe Building, 8 Xinhe Street
  • Maan Tang, Bantian , Longgang, Shenzhen, Guangdong
  • China
  • Guangdong
  • CN
  • 518129
  • caryleroot@outlook.com
  • 13428666765

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Axitera GmbH
  • Axitera GmbH
  • Kreuznacher Str.30,D-60486
  • Hessen,Frankfurt am Main
  • Germany
  • Frankfurt am Main
  • DE
  • 60486
  • successservice3@gmail.com
  • (+49)6934873848
  • https://seller.kuajingmaihuo.com/settle/qualification-service