10Pcs Long Lead Axial Polyester Film Capacitor 0.022uF 630V for Radio Amplifier

$54.00
FREE Shipping

10Pcs Long Lead Axial Polyester Film Capacitor 0.022uF 630V for Radio Amplifier

  • Brand: Unbranded

10Pcs Long Lead Axial Polyester Film Capacitor 0.022uF 630V for Radio Amplifier

  • Brand: Unbranded
Price: $54.00
Sold by:
$54.00
FREE Shipping

In stock

We accept the following payment methods

Description

Features: _x000D_ 1. High quality polyester film capacitors with stable performance. _x000D_ 2. The specifications of the capacitors is marked on its surface. _x000D_ 3. Lightweight with simple structure, easy to use. _x000D_ 4. Great choice for electronic professionals or enthusiasts. _x000D_ 5. Suitable for old radios and tube amplifiers. _x000D_ _x000D_ Specifications: _x000D_ Material: polyester film _x000D_ Quantity: 10pcs _x000D_ Voltage: 630V _x000D_ Capacitance: 0.022uF _x000D_ Diameter: 5.7mm/0.22in _x000D_ Capacitor Body Length: 15.3mm/0.6in _x000D_ Weight: Approx. 9g _x000D_ _x000D_ Package Included: _x000D_ 10 x Axial Polyester Film Capacitors _x000D_ _x000D_ Note: _x000D_ 1. Due to the difference between the monitors and light effect, the picture may not reflect the actual color of the item. _x000D_ 2. Please allow small deviation due to manual measurement. Thanks for your understanding.
  • Fruugo ID: 385470703-828646012
  • EAN: 3603060698490

Product Safety Information

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Safety Warnings: Do not let your children touch this product alone to avoid swallowing or other injuries

Delivery & Returns

Dispatched within 24 hours

  • STANDARD: FREE - Delivery between Fri. 17 October 2025–Fri. 24 October 2025 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Yicheng43
  • Wuhan Zhenhuishi E-commerce Co., Ltd.
  • 100, Area A, No. 54, Wuluo Road, Zhongnan Road Street, Wuchang District, Wuhan City, Hubei Province
  • Wuhan
  • China
  • 430000
  • gmotedf096@outlook.com
  • 18566228261

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Nolan Dax
  • HUMISS TRADING S.L
  • Calle Luis Bunuel 12-3A
  • Madrid
  • Spain
  • 28018
  • Nolandax0909@gmail.com
  • 34613177772