20pcs 450V 22uf 105 Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier

$19.95
FREE Shipping

20pcs 450V 22uf 105 Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier

  • Brand: Unbranded

20pcs 450V 22uf 105 Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier

  • Brand: Unbranded
RRP: $24.95
Price: $19.95
You save: $5.00 (20%)
Sold by:
$19.95
FREE Shipping

In stock

We accept the following payment methods

Description

Features:High quality electrolytic capacitors with stable performance.The specifications of the capacitors is marked on its surface, convenient to use.Heat resisting, low leakage, low loss and low impedance.Great choice for electronic professionals or enthusiasts.Suitable for a wide range of electronic applications. Specifications:Working Voltage: DC 450VSurge voltage: DC 500VValue: 22ufCapacitance Tolerance: 20%Operating temperature: 105Dissipation Factor: <0.24 at 20/120HzDimensions: Approx. 21 x 13mm / 0.83 x 0.51inLead type length: Tin plating copper layerLead length: 27mm / 1.1inchType: PolarizedQuantity: 20pcsWeight: Approx. 79gPackage Included:20 x Electrolytic Capacitor.
  • Fruugo ID: 419685441-884511171
  • EAN: 7890797524635

Product Safety Information

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Product Safety Labels

CE Mark
Safety Warnings: Warning: Please read the product instructions carefully before use to ensure correct use.
Serial Number: 7890797524635

Delivery & Returns

Dispatched within 2 days

  • STANDARD: FREE - Delivery between Fri. 24 October 2025–Fri. 31 October 2025 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Shenzhen Gujun Technology Co., Ltd.
  • Shenzhen Gujun Technology Co., Ltd.
  • 1303, 13/F, Tower B, TCL Building, No. 6 Gaoxin Nandao Road, Yuehai Street
  • Nanshan District
  • Shenzhen
  • Guangdong
  • CN
  • 518067
  • idyaiy16984@163.com
  • 13038870349
  • https://hengruigongju.1688.com/page/index.html?spm=0.0.wp_pc_common_header_companyName_undefined.0

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • None
  • Kequ Technology s.r.o.
  • Pražákova 1008/69
  • Štýřice
  • Jihomoravský kraj
  • Brno
  • CZ
  • 63900
  • christopher25106@outlook.com
  • 420608214795
  • https://www.ozon.ru/seller/topstore-600244/products/?miniapp=seller_600244&__rr=1&abt_att=1