
Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 3M/5M/10M/15M for Small Medium Large Dog
+ $5.99 Shipping
Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 3M/5M/10M/15M for Small Medium Large Dog
- Brand: Unbranded

Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 3M/5M/10M/15M for Small Medium Large Dog
- Brand: Unbranded
RRP: | |
Price: | |
You save: | $25.00 (25%) |
In stock
We accept the following payment methods
Description
- Brand: Unbranded
- Category: Pet Leashes
-
Size: 5 Meters
-
Colour: 12mm Black
- Fruugo ID: 259993062-567767098
- EAN: 9174767341131
Product Safety Information
Please see the product safety information specific to this product outlined below
The following information is provided by the independent third-party retailer selling this product.
Product Safety Labels

- Keep out of reach of children: to prevent accidental ingestion, misuse or injury.
- Always follow instructions: to ensure proper use and prevent malfunctions or accidents.
- CE applies only to electronic products
Delivery & Returns
Dispatched within 24 hours
-
STANDARD: $5.99 - Delivery between Fri. 17 October 2025–Mon. 27 October 2025
Shipping from China.
We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy
Product Compliance Details
Please see the compliance information specific to this product outlined below.
The following information is provided by the independent third-party retailer selling this product.
Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.
- HongKong Zhengtaishun Trading CO., Limited
- HongKong Zhengtaishun Trading CO., Limited
- Room 27E, Block A, Block B, Xiandaizhichuang, No. 1078, Huaqiang North Road, Fuqiang Community, Huaqiang North Street, Futian District
- Shenzhen
- CN
- 518000
- 917277199@qq.com
- 18820202091
- https://www.fruugo.co.uk/search?merchantId=19464
Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.
- E-CrossStu GmbH
- E-CrossStu GmbH
- 69 Mainzer Landstrasse
- Frankfurt am Main, Hessen
- DE
- 60329
- E-CrossStu@web.de
- +49 69332967674