Extra Long Line Training Dog Leash - Long Lead For Large, Medium And Small Dogs - Great

$69.00
+ $11.99 Shipping

Extra Long Line Training Dog Leash - Long Lead For Large, Medium And Small Dogs - Great

  • Brand: Unbranded

Extra Long Line Training Dog Leash - Long Lead For Large, Medium And Small Dogs - Great

  • Brand: Unbranded
RRP: $84.00
Price: $69.00
You save: $15.00 (17%)
Sold by:
$69.00
+ $11.99 Shipping

In stock

We accept the following payment methods

Description

Dimensions - Width:2.5Cm. Available In Three Size, 10M, 15M, 20M. Tested To Over 100Kg Pull Force Great for Hiking, Camping, Training, Hunting, Backyard, Beach, Recall Training, Outdoor Play With Tennis Balls, and Swimming . Durable Training Lead - This Durable Polypropylene Dog Training Leash Will Outlast Nylon Leashes. All Stitching Is Reinforced and The Nickel Plated Clip Swivels To Resist Twisting. Our Long Dog Leash Is Great for Small and Medium and Large Dogs. . Long Leash: This Training Leash Is Great for Teaching Your Dog Recalls. It Has The Length Needed To Allow Them To Wander and Ensure Your Command To Come Is Obeyed. Allows You To Teach Your Dog Recalls and Other Obedience Skills. . Built Strong: Pp Leashes Have A Long Lifespan, Cotton Leashes Get Frail and Break Faster Than You Would Think. Scm Long Leash Is Built With Heavy Duty Materials That Can Withstand Daily Use Over An Extended Period of Time. .
  • Fruugo ID: 205129611-436027599
  • EAN: 9154994369122

Product Safety Information

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Safety Warnings: WARNING!TO AVOID DANGER OF SUFFOCATION,KEEP AWAY FROM BABIES AND CHILDREN.DO NOT USE IN CRIBS/BEDS OR PLAY PENS.THIS BAG IS NOT A TOY.
Ingredients: Octinoxate 4.9%
Manufacturer Part Number: QA312445
Model Number: QA412445
Serial Number: QA212445
Batch Number: QA512445

Delivery & Returns

Dispatched within 2 days

  • STANDARD: $11.99 - Delivery between Wed. 15 October 2025–Wed. 22 October 2025

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Ping Yu
  • Zhongshan Rongxiang Trading Co., Ltd.
  • Room 303, No. 84, Minquan Road, Shiqi District
  • Zhongshan
  • CN
  • 528400
  • tianxingjian_fg@outlook.com
  • 13797402294

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Axitera GmbH
  • Axitera GmbH
  • Kreuznacher Str. 30, D-60486 Frankfurt a.
  • Frankfurt am Main
  • DE
  • 60486
  • successservice3@gmail.com
  • (+49) 6934873848