High quality 20pcs 450V 22uf 105C Long Lead Axial Electrolytic Polarized

$26.95
+ $17.99 Shipping

High quality 20pcs 450V 22uf 105C Long Lead Axial Electrolytic Polarized

  • Brand: Unbranded

High quality 20pcs 450V 22uf 105C Long Lead Axial Electrolytic Polarized

  • Brand: Unbranded
RRP: $35.95
Price: $26.95
You save: $9.00 (25%)
Sold by:
$26.95
+ $17.99 Shipping

In stock

We accept the following payment methods

Description

20pcs 450V 22uf 105C Long Lead Axial Electrolytic Polarized Capacitor Tube Amplifier...
  • Fruugo ID: 412321361-871873450
  • EAN: 6903379682782

Product Safety Information

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Product Safety Labels

CE Mark
Safety Warnings: Read instructions before use
Ingredients: 95% plastic 5% metal

Delivery & Returns

Dispatched within 10 days

  • STANDARD: $17.99 - Delivery between Thu. 30 October 2025–Thu. 06 November 2025

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Shenzhenshiaichuangyouwangluokejiyouxiangongsi
  • MEIQUAN PAN
  • 517-C, Block 543, Bafengling Industrial Zone
  • Bagua 2nd Road, Hualin Village District, Yangling Street, Futian District
  • Shenzhen 518000 China
  • Shenzhen
  • CN
  • 518000
  • xincheng23@hotmail.com
  • 18679230808

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Axitera GmbH
  • Axitera GmbH
  • Kreuznacher Str. 30, D-60486 Frankfurt am Main, Hessen, Germany
  • Frankfurt
  • Germany
  • D-60486
  • infonoticeeran@gmail.com
  • (+49) 6934873848